Technical Analysis for BBCP - Concrete Pumping Holdings, Inc.

Grade Last Price % Change Price Change
F 6.68 -2.34% -0.16
BBCP closed down 1.58 percent on Friday, May 17, 2024, on 88 percent of normal volume.
Earnings due: Jun 6
*** please verify all earnings dates ***
0 Watchers
Watchlist Portfolio

Trend Table & Recent EOD Trading Signals

ADX Long Term Intermediate Term Short Term
Strong Down Down Down

Date Alert Name Type % Chg
NR7 Range Contraction -3.88%
Narrow Range Bar Range Contraction -3.88%
Inside Day Range Contraction -3.88%
New Downtrend Bearish -2.91%
Gapped Up Strength -2.91%
Upper Bollinger Band Touch Strength -2.91%
New Uptrend Bullish -3.88%
Weak + Overbought Other -3.88%
Gapped Up Strength -3.88%
Overbought Stochastic Strength -3.88%

   Recent Intraday Alerts

Alert Time
60 Minute Opening Range Breakdown 40 minutes ago
Fell Below Previous Day's Low 40 minutes ago
Down 1% 40 minutes ago
Fell Below 20 DMA 40 minutes ago
10 DMA Resistance about 5 hours ago

Free Daily (Stock) Chart Reading

Let us help you stay on top of your investments. We will alert you to important technical developments on your portfolio & watchlist.

Profile

Concrete Pumping Holdings, Inc. Description

Concrete Pumping Holdings is the leading provider of concrete pumping services in the highly fragmented U.S. and U.K. markets, operating under the only established, national brands in both markets (Brundage-Bone and Camfaud, respectively). Concrete pumping is a "mission-critical" method of concrete placement that requires highly-skilled operators to position a truck-mounted fully-articulating boom for precise delivery of ready-mix concrete from mixer trucks to placing crews on a job site. CPH's large fleet of specialized pumping equipment and highly-trained operators position CPH to deliver concrete placement solutions that facilitate substantial labor cost savings to customers, shorten concrete placement times, enhance worksite safety and improve construction quality. CPH operates a fee-based revenue model with no bonding requirements. CPH is also the leading provider of concrete waste management services in the U.S. market, operating under the only established, national brand, Eco-Pan. Highly complementary to its core concrete pumping service, Eco-Pan provides a full-service, cost-effective, regulatory-compliant solution to manage environmental issues caused by concrete washout. As of April 30, 2018, CPH provides concrete pumping services in the U.S. from a highly diversified footprint of 80 locations across 22 states and operates under the brand Brundage-Bone. In the U.K., CPH provides concrete pumping services from 28 locations and operates under the brand Camfaud. CPH provides route-based concrete waste management service from 13 locations in the U.S. under the brand Eco-Pan.


Classification

Sector: Basic Materials
Industry: Building Materials
Keywords: Construction Bone Waste Management Construction Equipment Concrete Pump Mixer Pavements Masonry Pumping Services E Waste Management Waste Management Services Environmental Issues Job Site

Is BBCP a Buy, Sell or Hold?

Indicator Bull Case Neutral / Hold Bear Case
50 DMA
200 DMA
ADX Trend
Oversold / Overbought
Relative Strength

Indicators

Indicator Value
52 Week High 9.15
52 Week Low 6.123
Average Volume 82,958
200-Day Moving Average 7.76
50-Day Moving Average 7.25
20-Day Moving Average 6.75
10-Day Moving Average 6.84
Average True Range 0.19
RSI (14) 45.36
ADX 26.48
+DI 17.57
-DI 26.97
Chandelier Exit (Long, 3 ATRs) 6.53
Chandelier Exit (Short, 3 ATRs) 7.04
Upper Bollinger Bands 7.05
Lower Bollinger Band 6.46
Percent B (%b) 0.65
BandWidth 8.74
MACD Line -0.09
MACD Signal Line -0.15
MACD Histogram 0.0578
Fundamentals Value
Market Cap 367.63 Million
Num Shares 53.7 Million
EPS 0.54
Price-to-Earnings (P/E) Ratio 12.67
Price-to-Sales 0.99
Price-to-Book 1.43
Pivot Point Level Traditional / Classic Fibonacci Demark Woodie Camarilla
Resistance 4 (R4) 7.07
Resistance 3 (R3) 7.07 7.01 7.03
Resistance 2 (R2) 7.01 6.95 7.00 7.01
Resistance 1 (R1) 6.92 6.91 6.89 6.92 7.00
Pivot Point 6.86 6.86 6.84 6.85 6.86
Support 1 (S1) 6.77 6.80 6.74 6.77 6.68
Support 2 (S2) 6.71 6.76 6.70 6.67
Support 3 (S3) 6.62 6.71 6.65
Support 4 (S4) 6.62